The process first. Then the technology.
An artificial intelligence project fails when it starts with the tool and ends with no way to know whether it worked. This is the order we work in: six phases, with what we do, what your company brings and what you get in each one.
of Colombian companies have no reliable way to calculate the return on AI.
That is why the metric is agreed on before building.
AWS and Strand Partners, survey of 1,000 business leaders, cited by Portafolio (August 2026)
The six phases.
Each one ends with something in writing that you can review before moving on. After discovery, getting a first process into operation normally takes four to eight weeks.
4 to 8 weeksis what it normally takes to get a first process into operation, after discovery.
Phase 1 of 6
Choose a process
It does not start with technology. It starts with a named process, someone who is accountable for it and enough volume for the change to show.
What we do
- A conversation to understand which processes weigh most on your operation.
- A frank read of which one is a good candidate and which is not.
What your company brings
- The process owner in the conversation.
- A sense of the volume: cases per month and people assigned.
What you get
- The chosen process and the reason for the choice.
- What it would take to get started.
Phase 2 of 6
Agree on the metric
An AI project without a metric ends in a debate of opinions. The number is defined, along with the system it comes from, who reads it and what it is today.
What we do
- Propose two or three metrics for the process.
- Establish the baseline with the data that already exists.
What your company brings
- Access to the process's historical data.
- The decision on which metric matters to the business.
What you get
- The metric, its source and its baseline.
- The success criterion, in writing.
Phase 3 of 6
Draw the new process
The real process is walked through with the people who do it, exceptions included. Then the new one is drawn: every step has an owner, which is the agent, a person or a system.
What we do
- Walk through the process with the team that runs it.
- Design the new flow, the permissions and the review points.
- Define where the model runs based on the data it handles.
What your company brings
- Time from the people who do the process.
- Your technology and security teams at the table.
What you get
- The process, drawn.
- The scope of the build.
- The security and data decisions.
Phase 4 of 6
Build and test
The agent is built with its integrations and its controls. Before it touches the operation, it is tested against historical cases whose correct answer is already known.
What we do
- Build the agent and the integrations.
- Put together the evaluation set.
- Fix it until it passes the agreed evaluation.
What your company brings
- Access to test environments.
- Historical cases and someone who can say what the correct answer was.
What you get
- The agent working in testing.
- The evaluation results, case by case.
Phase 5 of 6
Go live alongside the team
The agent starts in parallel with the current process: it proposes and a person compares. When the team confirms that it gets things right, it starts executing the agreed steps.
What we do
- Support the team through the first cases.
- Train the people who supervise the agent.
- Adjust based on what the operation shows.
What your company brings
- A group of users who use it every day.
- The decision on when it moves from recommending to executing.
What you get
- The agent in production.
- The first reading of the metric.
Phase 6 of 6
Operate, measure and adjust
An agent in production needs operating: it is monitored, the metric is read and it is corrected. With the first process running, the next one goes faster.
What we do
- Monitor the agent and its connections.
- Read the metric with you, period by period.
- Propose the next process.
What your company brings
- An owner who reads the metric.
- The cases where the agent failed.
What you get
- Reports on the metric.
- Ongoing improvements to the agent.
- The plan for the next process.
Five rules we do not negotiate.
They are what separates a process that changes from a pilot that never gets past the demo.
A process before a platform
It starts with a process that has an owner. The technology is chosen afterward, based on what that process calls for.
The metric before the build
What nobody agreed to measure at the start cannot be proven at the end.
A person decides
The agent prepares, verifies and drafts. Whatever calls for judgment, a signature or accountability stays with a person.
Your systems remain the source
What already works is not replaced. The agent works on top of the ERP, the core banking system or the medical record the company already has.
Nothing goes in untested
Every change is evaluated against real cases before it reaches the operation.