Skip to content

AI for energy, mining and utilities.

Costly assets, continuous operations and thousands of customers: the value lies in anticipating the failure, finding the loss and responding on time.

Who it is for: Oil and gas, mining, power generation, transmission and distribution companies, and utilities.

A technician in a hard hat walks through an electrical substation at dawn, with mountains and fog in the background.

What weighs on operations today.

Three things a project must solve from the design stage, not at the end.

  • A shutdown costs more than the project

    The assets are costly and operations are continuous. Anticipating a failure is worth more than any office savings.

  • The evidence is scattered

    Historian, work orders, shift reports and manuals. An engineer takes days to pull it together.

  • Thousands of customers, legal deadlines

    Every request and every complaint has a due date. The volume grows and the team stays the same.

Three processes, drawn with the agent inside.

Who does each step: a person, the agent or a system. Each process has its own page with data, controls and an initial scope.

Asset failure analysis

The agent gathers readings, history, shift reports and manuals, and drafts the analysis with its supporting evidence. The engineer decides.

  1. System

    The historian and the work orders record the event.

  2. Person

    The reliability engineer chooses which event warrants an analysis.

  3. Agent

    Reviews readings, failure history, shift reports and the equipment manuals.

  4. Agent

    Proposes the probable cause and the intervention, with its supporting evidence.

  5. Person

    Validates the analysis and defines what work is done and when.

  6. System

    The order is entered in the maintenance system.

Illustrative example of a typical process in this industry.

What gets measured
  • Engineering hours per analysis.
  • Unplanned downtime.
  • Time from event to decision.

Other processes where an agent saves work.

The list does not end here. If your process has volume, documents and a decision at the end, it is a candidate.

Assess a process in three minutes

The industry, in numbers.

Public data, each with its source. None of it is a MIMMERS result.

See AI in Colombia, in figures
  • 497USD million

    Natural resources and utilities invested USD 497 million in AI in Latin America in 2025 (USD 353 million and USD 144 million).

    IDC, Worldwide AI & Generative AI Spending Guide, March 2026

  • 80+USD million

    Codelco reports more than USD 80 million in value captured with its data and AI platform, mainly from optimizing processes and plant variables.

    Reporte Minero, August 2026

  • 400reliability engineers

    Petrobras trained a generative AI assistant on open models with its own data, for 400 reliability engineers. An analysis that took two to three weeks would come down to minutes.

    Deloitte, co-developer of the project

What we safeguard in every project.

The industry's conditions become design decisions.

  • Operational safety comes first

    The agent reads operations data and makes recommendations. It does not operate equipment or write to control systems.

  • Your technical knowledge stays yours

    Manuals, analyses and production data stay inside. The model can run on the company's infrastructure.

  • Legal deadlines are met

    In utilities, every response to a customer has a deadline. The process is designed to arrive on time.

See security and data governance

Tell us which process you want to improve.

The first conversation is free and it is about your operation. You leave with a clear picture of which process to start with and what it would take.

First conversation
Free of charge
Length
About 45 minutes
We reply within
one business day
Format
Online or in person