Skip to content

AI for manufacturing and industry.

In a plant, information is spread across sensors, work orders, the ERP and people's experience. An agent brings it together and prepares the decision.

Who it is for: Food and beverage, cement and building materials, chemicals, packaging and industrial goods companies.

A worker, seen from behind and holding a tablet, oversees a packaging line in a plant.

What weighs on operations today.

Three things a project must solve from the design stage, not at the end.

  • The data exists and nobody looks at it

    Readings, work orders and shift reports are kept for years. Gathering them to make a decision takes more time than operations have.

  • Knowledge sits with a few people

    What the planner or the quality manager with twenty years in the plant knows is not written down in any system.

  • The office holds back the plant

    Orders, certificates and files are done by hand. The product is ready and the paperwork is not.

Three processes, drawn with the agent inside.

Who does each step: a person, the agent or a system. Each process has its own page with data, controls and an initial scope.

Predictive maintenance of plant equipment

The agent reviews readings and history, alerts on equipment that drifts from normal and drafts the work order.

  1. System

    Readings and work orders are already in the maintenance system.

  2. Agent

    Reviews readings and failure history and alerts on equipment that drifts from normal.

  3. Agent

    Drafts the work order with spare parts, procedure and a suggested window.

  4. Person

    Confirms priority and date against the production plan.

  5. Person

    Carries out the order and notes what was found on the equipment.

  6. System

    The result goes back into the history and sharpens the next alert.

Illustrative example of a typical process in this industry.

What gets measured
  • Unplanned downtime.
  • Planning hours per order.
  • Rush spare-part orders.

Other processes where an agent saves work.

The list does not end here. If your process has volume, documents and a decision at the end, it is a candidate.

Assess a process in three minutes

The industry, in numbers.

Public data, each with its source. None of it is a MIMMERS result.

See AI in Colombia, in figures

What we safeguard in every project.

The industry's conditions become design decisions.

  • The plant does not stop

    The agent starts by making recommendations, alongside the current process. It only carries out steps when operations approve them.

  • It connects to what is already there

    The ERP, the maintenance system and the spreadsheets that run operations today remain the source of the data.

  • Your technical knowledge stays yours

    Formulas, specifications and procedures stay inside. When needed, the model runs on the company's infrastructure.

See security and data governance

Tell us which process you want to improve.

The first conversation is free and it is about your operation. You leave with a clear picture of which process to start with and what it would take.

First conversation
Free of charge
Length
About 45 minutes
We reply within
one business day
Format
Online or in person